Country: virtual / Norway
Language requirements: English
Duration: June – November 2024
For a short-term project we are currently recruiting for a Well Engineer with review experience
Background
The client based in Scandinavia is working with an international subsurface consultant for a competitive bid to a national oil company for a review of a Field Development Plan (FDP) for a FPSO project to be executed by an IOC.
The award is expected in May.
The Independent Review will comprise of five workstreams. The high-level objective is to determine if the FDP is fit for approval, and if not, to identify and recommend critical areas that require design changes or risk mitigations to meet objectives for a successful project.
The review period June to November 2024, mainly working remotely, but may require attendance at workshops (in Europe).
We are looking for seasoned well engineer with international experience, to be included in the work (if the bid is successful) as the single well engineering resource to cover Workstream 3; Well & completion design and drilling readiness.
Workstream 3; Well & completion design and drilling readiness.
Assistance for this project is requested for Workstream 3; Well & completion design and drilling readiness. Approx. 330 hrs (over the review period).
The objective of Workstream 3 is to address the question whether the proposed well and completion design are fit for purpose to enable the reservoir to be developed and produced as anticipated given the expected and possible reservoir and fluid characteristics and also to determine if the level of engineering definition (including technology readiness levels TRL’s) and logistical planning (including supply chain access and management) is sufficient for FDP approval to proceed. The review will determine the likelihood of the well costs coming in as estimated.
The detailed scope workstream 3 covers:
- Wells Basis of Design, i.e. suitability, technology, proposed rig strategy, engineering standards applied, etc
- Production Efficiency and Life of Well Management
- Wells Cost and Schedule Estimate
- Development Risks and Mitigations
Deliverables workstream 3:
- Participation in workshops and regular meetings
- Detailed written technical report
- Input to final presentation.